800 Volt DC Power Distribution

Pre-engineered modular distribution built for the density and efficiency of next-generation AI infrastructure.

Open electrical control panel with organized wiring, circuit breakers, relays, and terminal blocks inside a metal enclosure with a vented top section.

Modular DC distribution, engineered to your architecture

Pre-engineered

Cuts on-site assembly time

Pre-engineered modular distribution arrives ready to integrate, reducing field assembly and improving quality control.

Row of large industrial electrical panels or circuit breaker cabinets lined up inside a warehouse with a high ceiling and concrete floor.

The difference is in how we build

Emerging architecture, proven discipline.

PowerStream SolutionsOthers
Lead time6 weeks from order to factory test completion12 to 16 weeks typical
Quote and drawings24 to 48 hours, reviewed by a senior engineerWeeks of back-and-forth on submittals
AssemblyPre-engineered and modular, reduced on-site workComponent-by-component field assembly
ManufacturingIn-house engineering, fabrication, and testing in Aledo, TexasOutsourced, subject to supply chain lead times
Delivery record100% on-time deliveryVariable, schedule risk carried by you

Built for AI-era infrastructure

Open electrical panel inside an industrial warehouse with three large circuit breakers mounted vertically, connected with wiring and components, and a visible interior structure.
Hyperscale infrastructure

Power architecture for AI data centers

As AI workloads push power density higher, 800VDC distribution supports the efficiency and scale that next-generation data centers require.

Prefab and modular

Modular distribution for fast deployment

Pre-engineered modules integrate into prefab and modular builds, aligning with off-site construction schedules and cutting on-site assembly.

Close-up of power distribution busbars inside an electrical panel, showing metal connectors, numerous bolts, and red insulating components arranged vertically and horizontally.
Electrical control panel with organized wiring connected to breakers, relays, and terminals inside a metal enclosure.
Mission critical

Engineered reliability for critical loads

Built with the same engineering discipline, factory testing, and documented results as every PowerStream product line.

See Markets Served

Frequently Asked Questions

Common questions about 800VDC power distribution.

What is 800VDC power distribution?

...

Why is 800VDC used in AI data centers?

...

How long is the typical lead time?

Standard engineer-to-order lead time is six weeks from order to factory test completion.Quotes and drawing packages are returned in 24 to 48 hours. Expedited schedules are evaluated on a project-by-project basis.

Is the equipment factory tested?

Yes. Like every PowerStream product, units are factory tested with documented results before shipment.

What certifications apply?

...

How do I get a quote?

Send your specs through the Request a Quote form. A senior engineer reviews every request and responds within 24 to 48 hours with a quote and accurate drawings.

Need more information?

Contact our engineering team or request a quote.

Ready to order

Get a quote in 24 to 48 hours or speak directly with our engineering  solutions design team.